m

ANALYSIS TIME STUDY AND TAKT TIME IN THE PRODUCT LOADING PROCESS

Authors
  • Mochammad Amru Nail Suherman

    Muhammadiyah University of Sidoarjo, Indonesia
  • Tedjo Sukmono

    Muhammadiyah University of Sidoarjo, Indonesia
Keywords:
Material handling, Time study, Takt time, Roll loading, Shipping capacity
Abstract

Objective: The purpose of this study is to determine the standard delivery process time and also determine the speed of workers. Method: The results of observations in this study will be processed using the time study method, which is a process used to determine how long it takes when carrying out a job or task with the aim of improving performance. This method will then be compared with the takt time method, which is a method of determining decisions regarding production capacity through the production system within a predetermined time. Results: The results used as the best time determination using the standard time of 47.01 minutes. Then, the takt time result of 21.6 minutes is used as a simulation of a more efficient roll loading process planning proposal. Novelty: This research highlights the problem of differences in roll loading process time between morning, afternoon, and night shifts, resulting in a 74.7% decrease in shipping capacity. The study introduces a comparison between time study and takt time methods to improve process efficiency and optimize shipping capacity.

References

C. D. Anggraini., N. R. Istiari,. G. Satrio, “Implementasi Prosedur Kegiatan Lapangan Penumpukan dan Gudangn Lini I General Cargo di Terminal Mirah Pt. Pelindo III Regional Jawa Timur”, vol. 4, no 1, 2022, pp. 35-36.

Somadi., B. S. Priambodo., P. R. Okraini, “Evaluasi Kerusakan Barang Dalam Proses Pengiriman Dengan Menggunakan Metode Seven Tools”, vol. 6, no. 1, June 2020, pp. 1-2. [Online]. Availabel: http://dx.doi.org/10.30656/intech.v6i1.2008

A. N. Cahyawati, and N. D. Prastuti, “Analisis Pengukuran Waktu Pada Proses Packing Kasa Hidrofil Menggunakan Metode Stopwatch Time Study”, February 2018, pp. 1-2.

A. Y. Pradana, and F. Pulansari, “Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi di Pt. XYZ”, vol. 2, no. 1, 2021, pp. 13-14. [Online]. Availabel: http://juminten.upnjatim.ac.id/index.php/juminten

T. U. Hasanah., T. Wulansari., T. Putra., M. Fauzi, “Penerapan Lean Manufacturing Dengan Metode Takt Time dan FMEA Untuk Mengidentifikasi Waste Pada Proses Produksi Steril di Industri Farmasi”, vol. 7, no. 2, 2020, pp. 88-89. [Online]. Availabel: http://jrsi.sie.telkomuniversity.ac.id

O. B. Saputri., N. Huda., M. Hannase, “Analisis Rencana Elektronifikasi Keuangan Daerah Dalam Memperluas Kontribusi Zakat Degan Pendektakan Fishbone Diagram Analysis”, vol. 10, no. 1, March 2022, pp. 5-6.

M. Rahayu, and S. Juhara, “Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja”, Jurnal Pendidikan dan Aplikasi Industri, vol. 7, no. 2, Agust 2020, pp. 93-94.

N. Yudisha, “Perhitungan Waktu Baku Menggunakan Metode Jam Henti Pada Proses Bottling”, vol. 2, no. 2, October 2021, pp. 85-87. [Online]. Availabel: http://jurnal.alazhar-university.ac.id/index.php/vorteks

S. B. Prayuda, “Analisis Lingkungan Kerja Dalam Menentukan Waktu Baku Untuk Meningkatkan Produktivitas Kerja Pada Produksi Kerudung Menggunakan Metode Time Study Pada UKM Lisna Collection di Tasikmalaya”, Jurnal Mahasiswa Industri Galuh, vol. 1. no. 1, 2020, pp. 120-122.

Heldayani, and F. Yuamita, “Perbaikan Work Station dan Pengukuran Waktu Kerja Dalam Menentukan Waktu Standar Guna Meningkatkan Produktivitas Pada Lini Kerja Spot Assembly”, Universitas Teknologi Yogyakarta, vol. 1, no. 9, Agustus 2022, pp. 2945-2946.

B. Arianto, “Buku Petunjuk Praktikum Analisis Perancangan Kerja”, Universitas Dirgantara Marsekal Suryadarma, March 2024, pp. 3-4.

J. Saputra., E. Hafrida., M. Musri, “Pengukuran Waktu Kerja Berbasis Stopwatch Time Study dan Analisis Keselamatan Kesehatan Kerja Pada Pabrik Tahu Sukri Bukti Batrem Dumai”, Jurnal Aplikasi Rancangan Teknik Industri, 2020. pp. 88-90.

R. N, Hidaya., L. M. Sabri., M. Awaluddin, “Analisis Desain Jaring GNSS Berdasarkan Fungsi Presisi”, Jurnal Geodesi Undip, vol. 8, no. 1, January 2019, pp. 50-51.

E. M. Sari, and M. M. Darmawan, “Pengukuran Waktu Baku dan Analisis Beban Kerja Pada Proses Filling dan Packing Produk Lulur Mandi di Pt. Gloria Orgita Cosmetic”, vol. 2, no. 1, January 2020, pp. 52-54. [Online]. Availabel: http://journal.univpancasila.ac.id/index.php/asiimetrik/

P. V. Aysyiawan and H. F. Satoto, “Analisis Pengukuran Waktu Kerja dan Beban Kerja Mental Guna Menentukan Tenaga Kerja Yang Optimal Pada Cv. XYZ”, vol. 1, September 2022, pp. 185-186.

B. I. Putra and R. B. Jakaria, “Buku Ajar Analisa dan Perancangan Sistem Kerja”, Universitas Muhammadiyah Sidoarjo, 2020.

A. Y. Haryudiniarti, and W. Putri, “Work Analysis of Wire Handling Process Using Work Sampling Method and Standard Time Determination”, vol. 1, no. 1, June 2022, pp. 18-19. [Online]. Availabel: https://journal.jgu.ac.id/index.php/j-gers

A. S. Ramadhani, “Pengukuran Waktu Baku dan Analisis Beban Kerja Untuk Menentukan Jumlah Optimal Tenaga Kerja Pada Proses Cetak Produk Lipstick”, vol. 12, no. 2, 2020, pp. 180-181.

H. Damayanthi, and S. Hidayat, “Pengukuran Waktu Baku Stasiun Kerja Pada Pipa Jenis Sio Menggunakan Metode Jam Henti di Pt. XYZ”, November 2020.

N. Yuselin, and I. G. A. Angganatha, “Meningkatkan Efisiensi Line Painting Propeller Shaft Kategori 2 dan 3 Dengan Metode Line Balancing di Pt Inti Ganda Perdana”, Technologic, vol. 10, no. 2, Desember 2019, pp. 1-2.

R. A. Imram., D. F. Panjaitan., N. S. Uletika, “Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency”, Journal of Industrial Engineering and Halal Industries, vol. 2, no. 1, June 2022, pp. 14-15.

Z. Sinaga, “Perencanaan Waktu Kerja Pada Produksi Water Pressure Tank Guna Meningkatkan Produktivitas Dengan Metode Time Study”, vol. 11, no. 1, February 2023, pp. 41-43. [Online]. Availabel: http://ejournal.unismabekasi.ac.id

T. Hidayat, and A. Saefulloh, “Perawatan Carryroller belt Conveyor C101 Pada Mesin Incinerator Dengan Metode Fishbone Diagram di Pt Fajar Surya Wiesa, Tbk”, Jurnal Teknik Industri, vol. 3, no. 1, 2022, pp. 49-50.

Downloads
Published
2025-08-31
Section
Artikel
License

Copyright (c) 2025 Mochammad Amru Nail Suherman, Tedjo Sukmono

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

How to Cite

ANALYSIS TIME STUDY AND TAKT TIME IN THE PRODUCT LOADING PROCESS. (2025). International Journal of Economic Integration and Regional Competitiveness, 2(8), 40-55. https://doi.org/10.61796/ijeirc.v2i8.391

Similar Articles

41-50 of 104

You may also start an advanced similarity search for this article.