[1]
“ANALYSIS TIME STUDY AND TAKT TIME IN THE PRODUCT LOADING PROCESS”, IJEIRC, vol. 2, no. 8, pp. 40–55, Aug. 2025, doi: 10.61796/ijeirc.v2i8.391.